A Master Roster is a reusable, repeating pattern of shifts that you build once and then assign to employees.
Instead of scheduling the same shift pattern by hand for every employee, every period, you define it a single time and biotime rolls it forward automatically.
Think of it as a template for “how this role normally works”:
Days: Monday to Friday, 9:00 to 17:00 with a 30-minute break for waged or salary staff.
A rotating 4-week pattern of early, late and night shifts for the nursing team.
Weekend security: Saturday and Sunday, 18:00 to 06:00.
Master Rosters are especially useful for employees with repetitive schedules. They reduce manual re-entry and improve the accuracy of reporting.
1 Save time
Build a pattern once instead of rebuilding it every cycle: weekly, fortnightly, four-weekly, or monthly.
2 Stay consistent
Change the pattern in one place and it flows through to everyone assigned to it.
3 Handle any rotation
Weekly, fortnightly, four-weekly, monthly, or longer, not just a single week.
| Tool | What it is | When you use it |
|---|---|---|
| Master Roster | A reusable, repeating shift pattern assigned to employees. | To set up and maintain a standard working pattern. |
| Group Master Roster | The same idea, but for a whole team. Each shift specifies how many employees are needed to cover it. | When you're planning coverage for a group, not one employee's routine. |
| Everyday roster (Planner / Employee Roster) | The actual shifts on real calendar dates for real employees. | For day-to-day changes, swaps, and one-off adjustments. |
The Master Roster is the blueprint. The everyday roster is what gets generated from it, and you can still adjust it for one-off changes without touching the Master Roster itself.
Need pay or award day definitions instead of shift times? That's a separate tool called a Work Pattern.
1name field 2description field 3period length slider 4roster grid, where you drag to create and resize shifts 5clipboard icon, to copy a shift across days 6minus icon, to delete a shift 7worked and break time totals
Building a Master Roster doesn't schedule anyone by itself. You then need to assign it.
Getting the dates wrong will skew the roster: for example, if your pay period starts on a Monday but you set the date to Tuesday, every subsequent shift will be off by a day.
This split is useful when you want to keep a team locked to the same rotation cycle while individuals join on different dates. For example, a new starter can join an established four-week rotation partway through, without knocking the rest of the team out of step.
1the Assign To Employees button that opens this dialog 2the Select button, to pick employees 3the From and Effective Start date fields 4the optional To (end date) field
1the Master button, which opens the Select Master Roster dialog 2the Select button next to the Master template row 3the checkmark button, to apply the selected template
No. The template only updates a schedule once you reassign it. Save your changes, then reassign the template via Assign to Employees (or the Master button on the employee's roster screen) for it to push through. Shifts you've already manually adjusted for a specific date keep your adjustments.
Yes. Assign a new Master Roster with its own start date, and biotime handles the transition for you.
A Master Roster defines the actual shifts employees work (times, breaks, jobs). A Work Pattern supplies the contracted hours per day that pay and award rules read: a number, with no shift times attached.
Yes. The period length can be extended to suit longer rotations, up to a maximum of 168 days.
Our support team knows biotime inside out. Send us a message and we'll get back to you, usually within one business day.
Prefer to call? AU 1300 139 460 · NZ 0800 111 438
From overseas: +61 7 5613 2700 · +64 9 820 3444
Monday to Friday, 8:30am – 5:00pm (AEST/NZST)